At mmWave frequencies, the cavity, copper edge, connector launch, and antenna clearance become part of the cir...
At mmWave frequencies, the cavity, copper edge, connector launch, and antenna clearance become part of the cir...
A high-power RF module can meet its electrical target and still fail in the field because the heat path was ne...
Ceramic PCB programs often move from concept to purchase order faster than the manufacturing package matures. ...
The most expensive Megtron 7 PCB problem is often a release problem, not a material problem. A prototype may r...
A high-speed board can pass fabrication inspection and still lose performance during assembly. Moisture exposu...
Connector launches often become the hidden bottleneck in a high-speed program. The laminate may have a low los...
A Megtron 7 PCB stackup must be frozen as an electrical and manufacturing contract before layer count or imped...
A long backplane channel can fail a design review even when the laminate choice looks correct on paper. The us...
The released Megtron 6 PCB construction is the reference for the DFM package. Any supplier change to a Megtron...
The Megtron 6 PCB connector launch remains the shared datum for SI and assembly inspection. The production Meg...