Aerospace PCB revision control for long-life programs begins before a substitute part reaches production. Risk appears when a component reaches end of life, procurement proposes an alternate, and the electrical design, land pattern, fabrication files, assembly instructions, and verification baseline no longer describe the same hardware. A Aerospace PCB release therefore needs a controlled change...